Ongoing Project

Sr. No Work Name Current Status
01 Work Order for Supply, Installation, Testing & Commissioning works of instrumentation & automation / scada works including electro-mechanical works and including 60 months comprehensive repairing, maintenance & monitoring works of newly constructed 30 nos. WDS. Installation of WDS and commissioning going on
02 Work for “Supply, installation, Operation and Maintenance of Flowmeters and Pressure Sensors at various points in Water Distribution Network and Integration with existing SCADA System of Ahmedabad City.”. SITC completed. O & M going on.
03 Comprehensive Operation, Repairing, Maintenance & Monitoring works of Electrical, Mechanical, Instrumentation & existing SCADA works of 148 nos. WDS, 4 nos. WTPs and 4 Frenchwells along with Replacement of Instrumentation Equipments (As & When required) for Three years of Water Operation (E & M) Department of Ahmedabad Municipal Corporation (AMC), Ahmedabad O & M going on.
04 Work for supply, installation and commissioning of multitrack (two path) insertion type Ultrasonic flow meters to the inlet, feeder mains and distribution branches ranging from 800mm to 2200mm. Installation of instruments going on.
05 Work for O & M of full bore EMI Flowmeters to the inlets, outlets, feeder mains and distribution branches of CWSS Stage-I, II & III Operation & maintenance going on.
06 Work for O & M of full bore EMI Flowmeters to the inlets, outlets, feeder mains and distribution branches of CWSS Stage- stage IV Phase-I. Operation & maintenance going on.
07 Work for O & M of full bore EMI Flowmeters to the inlets, outlets, feeder mains and distribution branches of CWSS Stage-4 Phase II Operation & maintenance going on.
08 Work for Supply, Installation, Testing, Commissioning, Operation and Maintenance of Supervisory Control and Data Acquisition System (SCADA) for Madhya Pradesh for Barna Dam, Bargi Dam &, Tawa Dam (Package – II). SITC of instruments Completed. O & M going on.
09 Work for supply, Installation, Testing, Commissioning, Operation and Maintenance of Supervisory Control and Data Acquisition System (SCADA) for Madhya Pradesh for Bansagar & Sanjay Sarovar Da(Package – III) SITC of instruments Completed. O & M going on.
10 Work of Supply, Installation, Testing, Commissioning, Operation and Maintenance of Supervisory Control and Data Acquisition System (SCADA) for for Madhya Pradesh for Gandhi Sagar Dam and Atal Sagar Dam (Package-I). SITC Completed. O & M going on.
11 Supply, Installation, Testing, Commissioning, Training, Maintenance, Electrification and Automation with SCADA System at Lower Manair Dam, Kaddam Narayana Reddy Project, Sriram Sagar Project Including Construction of Dam Control Room at Kaddam Narayana Reddy project of Telangana State under National Hydrology Project SITC of instruments is in process.
12 Work for Supply, Installation, Testing, Commissioning, Training, Operation and Maintenance of SCADA based Canal Automation for Nagarjun Sagar Right Main Canal Project, Andhra Pradesh under National Hydrology Project (NHP). Supply phase completed. Installation is in process.
13 Work for Providing, Supplying, Installing, & Giving, Satisfactory hydraulic testing of AMR Domestic & Non Domestic Water Meter (Excluding CIDCO Nodes) Under Panvel Municipal Corporation. TAL. PANVEL. DIST. RAIGAD. Supply phase completed. Installation is in process.
14 Supply, Installation, Testing, Commissioning and Maintenance of Wireless based pipe Flow metering System of DVC under National Hydrology Project (Package‐2). Supply phase completed. Installation is in process.
15 Appointment of System Integrators (SI’s) for IoT Deployment including Design, Implementation & Maintenance with Centralized IoT Platform for Jal Jeevan Mission Projects in State of Maharashtra. Survey phase completed. Installation is in process.